News2026-04-29

Chennai Plant in India: A 5,000 km Journey to Expand Precision Manufacturing

Seeing the Next Golden Decade Amid Global Transformation

As global manufacturing undergoes rapid transformation and supply chains continue to restructure, TJR firmly believes that only by taking proactive action can a company remain competitive in a changing world.

This move represents more than a geographic expansion—it marks a strategic step for TJR to extend its Taiwan-based technological expertise to the global stage.

On the land of Chennai, India, what began as drawings on paper and an empty field has gradually evolved into a modern manufacturing facility. Step by step, TJR is establishing a new production base, symbolizing the expansion of Taiwan’s precision engineering capabilities into the South Asian market.


I. Strategic Location: Why India? Why Chennai?

TJR’s decision to establish a presence in India is based on deep insights into global market dynamics and long-term industrial advantages:

  • India’s overall strengths
  1. A large demographic dividend and a growing pool of skilled technical talent.
  2. Strong government support through the “Make in India” initiative.
  • Industrial cluster advantages
  1. Rapid infrastructure development across India.
  2. Strong and growing demand in the automotive and machinery manufacturing sectors.
  • Chennai’s strategic position
    1. Geography & Trade

Well-developed seaports facilitate efficient international logistics and export operations.

    1. Industrial Environment

The region is home to numerous Japanese and Korean multinational companies, with mature and well-planned industrial zones.

    1. Policy Incentives

Local governments provide attractive corporate tax reductions and fiscal incentives for manufacturers.

TJR ultimately selected the Origins by Mahindra Industrial Park in Chennai, a key gateway to India’s manufacturing ecosystem.


II.Six Years of Dedication: The Development Journey of the TJR Chennai Plant

The journey has been steady and deliberate. Each year represents an important milestone in TJR’s strategic expansion:

  • 2019 – Initial evaluation of overseas expansion and the feasibility of entering the Indian market
  • 2020–2021 – Two on-site inspections were conducted, confirming industry compatibility and selecting Chennai as the operational base
  • 2022 – As global supply chains shifted due to geopolitical tensions, TJR accelerated its strategy and officially acquired land in the Chennai industrial zone
  • January 2024 – Launch of factory design and planning
  • Second half of 2024 – Construction of the plant officially commenced
  • 2025 – Participation in major industrial exhibitions across India to increase market visibility
  • Second half of 2026 – Construction progresses toward completion, entering the operational preparation phase

 

During the construction phase of the Chennai plant, footage of the project site appeared in a media interview video (approximately 1:17–3:00 showing construction scenes), providing a visual record of the factory’s development progress.
https://www.youtube.com/watch?v=MEQKlDjoigI

圖片1
圖片2

From red soil fields to rising steel structures, the site has gradually transformed into a modern manufacturing facility.

III.    Expanding Market Presence: Building Brand Recognition in India

2025 - 2026 marked a breakthrough year for TJR in the Indian market.
Through participation in major industry exhibitions, TJR introduced Taiwan’s precision manufacturing technology to customers across India.
Exhibitions included:

圖片1

Bengaluru Exhibitions

圖片2

Delhi Exhibitions

圖片3

Chennai Exhibitions

圖片4

Gujarat Exhibitions

TJR’s iconic yellow brand identity toured across India, demonstrating the technological strength and reliability of its high-quality rotary tables.

IV.    Local Manufacturing, Global Service

Looking back, establishing operations in India and Chennai was never simply a low-cost decision. Instead, it represents a crucial step in TJR’s strategy for future growth and industrial transformation.
With the factory construction nearing completion in the second half of 2026, TJR is entering a new operational phase in India.
From this new base, TJR will provide faster, higher-quality service to customers worldwide while continuing to strengthen its role in the global precision manufacturing industry.